![]() |
| marc. |
![]() |
| paul. |
![]() |
| gilo. |
![]() |
| dennis. |
![]() |
| marc. |
![]() |
| dave. |
![]() |
| julian. |
img { max-width: 560px; width: expression(this.width > 560 ? 560: true); }
![]() |
| marc. |
![]() |
| paul. |
![]() |
| gilo. |
![]() |
| dennis. |
![]() |
| marc. |
![]() |
| dave. |
![]() |
| julian. |
![]() |
| Finally, the Beast is growing. Photo: Buechi |
![]() |
| It was hot, but it was great! Photo: Buechi |
| A concrete slip and slide. It actually worked. Photo: Marc Bachmann |
| Syltan was in the second shift, smoothing it! Photo: Marc Bachmann |
| Chrigel and the Wobbel! Photo: Marc Bachmann |
![]() |
| Overview after day 2. Photo: Buechi |
| Overview of day 1 work. Photo: Marc Bachmann |
![]() |
| Did I mention it was incredibly hot? Photo: Buechi |
![]() |
| on day 2 we did the flat! Photo: Buechi |
| Shaping, trallaala! Photo: Marc Bachmann |
![]() |
| Slip and slide Olé Olé Photo: Büchi |
![]() |
| Heavy Work! Photo: Nicolas Büchi |
![]() |
| Boris derailing! Photo: Büchi |
![]() |
| Smoothest Surface we ever made! Photo: Buechi |
| Exhausted and drinky! Photo: Marc Bachmann |
![]() |
| The first time this year, it's warm enough to chill outside! © Christoph Spiess |
![]() |
| The Fuchs, going to the Roof. © Christoph Spiess |
![]() |
| The Herzblut Gang send some of their finest: Stadi, FS 5-0. © Christoph Spiess |
![]() |
| The Fuchs, getting some speed. © Christoph Spiess |
![]() |
| Long Hair, don't care. Nicolas, dressed in elegant black. © Christoph Spiess |
![]() |
| Etienne, needs something to lean on. © Christoph Spiess |
![]() |
| Mirco got insanely good this winter. Backside Disaster in the Oververt pocket. © Christoph Spiess |
![]() |
| Fuchs, WTF. A Crailslide? Up there? Geh spinnts dir? © Christoph Spiess |
![]() |
| Herzblut Gang Boss, Paul Buner © Christoph Spiess |
![]() |
| Etienne with a Fakie Crooks. On the worst coping of the whole spot. © Christoph Spiess |
![]() |
| Feeblomat Grind by the N. © Christoph Spiess |
![]() |
| And a layback to make the night a night. © Christoph Spiess |
![]() |
| Here we are, concert of the awesome SRCKI. |
![]() |
| Naked Drummer! |
![]() |
| Thats a good fucking bunch, those ROW / Boldriders! |
![]() |
| Come back soon guys, we miss you already! |
![]() |
| That was the room, as it looked like, when we first entered it. |
![]() |
| The first big cleaning round. This was a hell's work. |
![]() |
| Wood Work |
![]() |
| The plan was, to build on one side a quarterpipe, and on the other a wallride. |
![]() |
| Boris in the wooden frame of the wallride. |
![]() |
| Fuck, I nearly forgot, how much work it was, to get all the trash together to fill the ramps at that time. |
![]() |
| Sylvain, filling up the shit. |
![]() |
| It starts to look a little bit like it should. This was mid November 2011. |
![]() |
| Looks like we were ready for the concrete. |
![]() |
| Rebars in the wallride. We had luck, and found the rebars onsite. |
![]() |
| Rebars in the quarterpipe. |
![]() |
| Filling up with concrete. |
![]() |
| Quarterpipe is finished. Fuck, I see the wobbels even on this picture. They are still there... |
![]() |
| The first step was done in early December 2011. |
![]() |
| Paintjob Pro. |
![]() |
| Nearly... |
![]() |
| In February 2012, we continued with the second stage. On this day, when we made the wood work, it was around - 15° Celsius. |
![]() |
| Wood work on the left side. At this time, we thought about doing a spine, there on the left side. |
![]() |
| Filling it up with trash was a big task. Fuck! |
![]() |
| I just love pictures of cement, sand and gravel bags. Really. |
![]() |
| Cutting the floor and producing as much dust as possible. |
![]() |
| And it took hours to mix all the concrete. Small machine. |
![]() |
| Concrete on wall, not much to say about that here. |
![]() |
| Shaping for gods sake. |
![]() |
| Second Part is ready. |
![]() |
| This was the state on easter 2012. Nearly perfect. |
![]() |
| Dust was also a big problem at that time. |
![]() |
| Ok, let's start with the preparations for part III. |
![]() |
| This time, we filled it up with styrofoam. It works and is 100'000 times easier work than filling it up with stones. |
![]() |
| Rebaring. |
![]() |
| We did a thin layer of ghetto concete, so everything would hold together. We were not sure, if the styrofoam works so well. |
![]() |
| Marky is a machine! |
![]() |
| We did the concrete in November 2012. |
![]() |
| Lunchbreak! For the first time, we had a proper lunch while working the 'crete. |
![]() |
| Roger and Men, passionate shaping. |
![]() |
| As said earlier, I like pictures of concrete bags. |
![]() |
| A good team, on a hard day. |
![]() |
| In one day, we made the big wobbel and the new quarter. |
![]() |
| Marky setting the pool coping. They were made by Pudi, thank you a lot. |
![]() |
| Construction Site overview. |
![]() |
| Last pool coping setting session. |
![]() |
| And it was done, nearly at least. |
![]() |
| We had to take down the paint, as it produced more dust than before. |
![]() |
| Another overview. |
![]() |
| Fuck Yeah, we did it again! |
![]() |
| First Session. Boris, 50-50. |
![]() |
| A nice red carpet makes it feel comfortable. |
![]() |
| Chrigel likes the opening session. |
![]() |
| Everybody was here, as usual. That feels good. |
![]() |
| And since the opening session mid december 2012, THE BEAUTY is ready to skate! Fuck Yeah! |
![]() |
| Yes, keep the fire burning! |